316L Expanded Metal at a North Point Walkway: Frames, Openings and Fit
We supplied 316L expanded mesh for the footbridge beside lift L1 near Tin Chiu Street, at the Island Eastern Corridor promenade in North Point, Hong Kong. Site and factory photographs explain the panels, metal frames and corner connections, together with the dimensions and installation information to confirm before selection.

Where the mesh was installed, and what we supplied
We supplied the 316L expanded mesh installed on the footbridge beside lift L1 near Tin Chiu Street, at the Island Eastern Corridor promenade in North Point, Hong Kong. The footbridge crosses the Boardwalk beneath the corridor; the site photographs show mesh on both sides, the glass canopy and the existing metal frames.
Our supply covers the expanded-mesh panels, not the glass canopy, existing metal frames or main steel structure of the corridor.

How to place the mesh at this location
The project address is: Footbridge across Boardwalk underneath the Island Eastern Corridor near Tin Chiu Street, Hong Kong.
The shared-frame photograph keeps the hoarding, site workers and corridor mesh in view. Names and signs on the hoarding belong to third parties at the site and are not our credentials; the existing frames and corridor structure are not presented as our products.

Specification and supply scope
The material for this batch is 316L. Diamond openings and metal frames are visible in the photographs. Opening size, strand thickness, panel dimensions, quantity and fixing method are confirmed for the project rather than estimated from a photograph or small package print.
| Item | This batch | Note |
|---|---|---|
| Product | Expanded-mesh panels | With metal frames |
| Material | 316L | Project-confirmed grade |
| Location | Beside lift L1 near Tin Chiu Street, North Point, Hong Kong | Along the footbridge sides |
| Supply scope | Expanded-mesh panels | Excludes the corridor main steelwork |
| Dimensions and fixing | Confirmed per project | Not estimated from a close-up |
Look beyond the openings when selecting side mesh
Side mesh is not only about the openings. The outer frame has to meet the site framework, and space is needed at corner connections. Provide the width, height and turns of the installation area before confirming opening size, panel dimensions and fixing method.

Product condition in the factory
The factory photographs show packaging and framed-product condition: one set shows wrapped expanded-mesh panels, while another shows a stack of panels with metal frames. Their captions identify them as factory images; the Hong Kong installation is covered in the first two sections. Stack counts and small package print are not used as project quantities or specifications.


Frame, mesh and the corner connection in close-up
The factory close-up shows the mesh held within a metal frame and the corner connection structure. It illustrates visible product condition only; dimensions and fixing are still confirmed against the project drawing and site conditions.

Questions we get asked
What material is this expanded mesh?
This batch is 316L. Grade selection has to be read together with the service environment, installation method and maintenance conditions; a product close-up alone cannot establish service life.
Did you supply the whole corridor?
No. We supplied the expanded-mesh panels. The glass canopy, existing metal frames and main steel structure are outside this supply scope.
What should we prepare for a similar project?
Start with site photographs, frame dimensions, installation location and turns. Then confirm material, opening size, panel dimensions and fixing method before fabrication is assessed from the drawing.
Send the location and dimensions before fabrication is assessed
See comparable stainless work under Project Cases and more product and selection articles under Technical Articles. Send site photographs, frame dimensions or drawings together with material, opening size, panel dimensions and fixing method through Contact; fabrication is assessed after confirmation.
Other articles in this section

Shunde Wharf Bollards: 304 Stainless Steel
How 100+ stainless bollards at Shunde Fisherman's Wharf were specified and built, including foundations, reflective sleeves, dome caps and checks.

Loading 60 Tonnes of Stainless Steel Coils: 3.5 Tonnes per Coil, Three Trucks to South Asia
This batch contains 60 tonnes of stainless steel coils, 3.5 tonnes per coil, divided among three trucks to South Asia. Real factory footage explains whole-coil loading, timber supports and packing straps, and makes clear that only one truck is shown. The HD original from Bilibili is embedded.